Tuesday, April 13, 2010

dates stage 2

i am sorry for the confusion of march, april and may in the hand out yesterday.
the dates should read as follows:

Concept: MO 12 April,THU 15 April

Design Development MO 19, THU 22 April
Detailed Design MO 26, THU 29 April
Final Crit: MO 03 May
Hand In: THU 06 May, 9am pin up
Thursday, 15.04.2010

4 A3 – the idea, the module vs the overall plan, the section and circulation.  
Schedule
Lecture 8.30 - 10am
Group 3 crits concept from 10am - 1pm
Group 1,2,4,crits concept from 2-5pm
Group 1,2,4 crits 1:2 on analysis project (according to order on staple)
Group 3 crits on analysis project 1:2 (according to order on staple) 
Group Tutors
1 KiKi (Anna is absent)
2 Guy
3 Kylie + Sergio
4 Thomas + Kay
From Monday on we will open 1 more group as we are more tutors now.

Wednesday, April 7, 2010

Lego Ville


Hi All
On Monday we will begin the design process/ stage 2 housing in Yeoville.
We will kick off with a short exercise:
You have to build a lego structure that is
a) made out of 300 lego stones with 6 dots
b) not more than 4 lego stones on top of each other
c) leaves at least parts of 2 sides of each stone (excl bottom and top surface) untouched by another stone
d) not wider or deeper than the sum of 15 legos long side length or 22 legos short side length or the equivalent as a mix
e) the structure can be made of smaller modules that undulate along the imaginary front/ backlines
(remember, rules can change…)


Why are we doing this?
The number of legos represent the number of 6sqm rooms for 100 people (3 legos pp)
that again is related to a high density development of ca 500p/ha for our site.

For Monday:
Get familiar with the programme.

The programme will be uploaded on the computerlab machines.
If you have your own computer and access to the net, please download.
And then: start to build!
http://ldd.lego.com/download/
For help:
C:\Program Files\LEGO Company\LEGO Digital Designer\Help\en-manual\en-manual.html

Tuesday, April 6, 2010

Presentation Research Yeoville, attendance whole day DP!

Presentation A+B 1,2,3: 10am – 1pm

Presentation A+B 4,5,6: 2pm-5pm

Please note that we are starting at 10 and have 30 min per group.
10 presentation, 10 feedback, 10 marking/ buffer
Students will be asked to present digitally and print out black and white copies of their work
which has to be pinned up at 9.30 (morning group) and 13.30 (afternoon group)


A+B 1 inside bubble
A+B 2 room next to bubble
A+B 3 outside bubble

A+B 4 inside bubble
A+B 5 room next to bubble
A+B 6 outside bubble

After the presentation groups will be asked to pin down and re-pin up in the studio in demarcated spaces.
All digital presentations have to be on the laptop at 9.30.
Looking forward to seeing you there.

Best KiKi.


Saturday, April 3, 2010

subdivision group - photos

i just had a look at the photographs and some of them are really great - however, most need serious colour correction. as discussed, i'd like to see you with your work on tuesday and can most propably help you in that domain.

enjoy the long weekend.