Friday, March 15, 2013

monday

final pin up time is monday 18 march 1pm.
no late works will be accepted.

the proposal to form groups for the base of the 1:50 model
is meant to save some work
the groups have to be formed within the tutors groups
and have to pin up next to each other.
leave your design work pinned up till wednesday
and add the construction part,
i will look at it as complete submission again.

the site model 1:100 has to be finished by now, again,
the intention was to work in 1:100 before going into 1:50
if you didn't do the model to date, there is no reason to do
it now. there will be slight deductions for it, but rather
concentrate on the drawings and the 1:50 model.

bring all your process models.
the brief as published before 
is as pdf on the public folder.
i emailed it again to farai.

Wednesday, March 6, 2013

provisional play:house marks

design 1 usually pinned up left, design 2 right
a very concerning pin up with even more concerning results
more later in person



presenting tomorrow


10 min max
starting 8.30

Abate
Barlow
Chimhanda
Collins
Hand
Leventhorpe

stand by

McBride
Pardesi
Schoonraad
Vidjak

Tuesday, March 5, 2013

Monday, March 4, 2013

for thursday

proposals for a new roof for proposed programme as framed timber construction, refering to parameters stated in brief and lecture

axo, plan, section, model

honkong, unknown





bradford, uk, kraus schoeneberg architects






rotterdam, mvrdv




testing + evaluating, use your axonometrie





roofscapes_work for thursday

 view from roof westwards




















all roof photographs by s mkhabela

Sunday, March 3, 2013