final pin up time is monday 18 march 1pm.
no late works will be accepted.
the proposal to form groups for the base of the 1:50 model
is meant to save some work
the groups have to be formed within the tutors groups
and have to pin up next to each other.
leave your design work pinned up till wednesday
and add the construction part,
i will look at it as complete submission again.
the site model 1:100 has to be finished by now, again,
the intention was to work in 1:100 before going into 1:50
if you didn't do the model to date, there is no reason to do
it now. there will be slight deductions for it, but rather
concentrate on the drawings and the 1:50 model.
bring all your process models.
no late works will be accepted.
the proposal to form groups for the base of the 1:50 model
is meant to save some work
the groups have to be formed within the tutors groups
and have to pin up next to each other.
leave your design work pinned up till wednesday
and add the construction part,
i will look at it as complete submission again.
the site model 1:100 has to be finished by now, again,
the intention was to work in 1:100 before going into 1:50
if you didn't do the model to date, there is no reason to do
it now. there will be slight deductions for it, but rather
concentrate on the drawings and the 1:50 model.
bring all your process models.
the brief as published before
is as pdf on the public folder.
i emailed it again to farai.